COMPLIANCE REPORTING · CF-1R合规报告 · CF-1R

California Title 24 compliance reports加州 Title 24 合规报告

We prepare residential Title 24 energy compliance reports under California's Building Energy Efficiency Standards. We model the project from your plans, coordinate with your design team, and explain what the report requires on site. Because reports are prepared from plans, no site visit is required, and we serve every California jurisdiction. On-site field verification is a separate service, available in our 12 Northern California counties.我们依据加州建筑能效标准编制住宅 Title 24 能源合规报告。我们根据您的图纸建立模型,与设计团队协同,并说明报告对现场施工的要求。报告依据图纸编制,无需现场勘查,因此我们可服务加州所有辖区。现场核验为单独服务,目前覆盖北加州 12 个县。

Deliverable交付文件
CF-1R
Standard适用标准
Title 24, Part 6Title 24 第 6 部分
Coverage覆盖范围
Every California jurisdiction, no site visit加州全部辖区,无需到场

WHAT IT IS什么是 Title 24

The standard, and the report that proves you meet it标准本身,以及证明合规的报告

Title 24 is the California Code of Regulations. Part 6 of it — the Building Energy Efficiency Standards — is what people mean when they say "Title 24" in a permit context. It sets the energy performance requirements for new construction and for regulated alterations to existing buildings, and it is updated on a three-year code cycle.Title 24 是加州行政法规。其中第 6 部分——建筑能效标准——才是许可语境下人们所说的 "Title 24"。它对新建工程以及既有建筑的受监管改造工程设定了能源性能要求,并以三年为一个规范周期更新。

The compliance report is how a project demonstrates it meets those requirements. We model the building from your plans, set the correct CEC climate zone for the site, and take one of two paths: prescriptive, where each component meets a fixed minimum; or performance, where the whole-building energy budget is met through trade-offs. The output is the CF-1R, which goes in with the permit application.合规报告是项目证明其满足这些要求的方式。我们依据您的图纸对建筑进行建模,为项目地点设定正确的 CEC 气候区,并采用两条路径之一:规定性路径,即每个部件均达到固定的最低要求;或性能路径,即通过权衡取舍满足整栋建筑的能耗预算。最终产出是 CF-1R,随许可申请一并提交。

What the CF-1R claims is what has to be built and later verified. Every measure listed on it becomes a field obligation — which is why we read the report against the plans rather than running a template. A measure claimed on paper and not installed is a permit that will not close.CF-1R 中申报的内容,就是后续必须施工并接受核验的内容。报告上列出的每项措施都会成为现场义务——这也是我们坚持将报告与图纸逐一核对、而非套用模板的原因。纸面上申报却未安装的措施,会导致许可证无法结案。

Code cycles matter. A project permitted under one cycle is judged against that cycle's requirements, and design decisions made early can lock you into a path that a later cycle would have made cheaper. We flag where a pending cycle change would affect the compliance strategy, so the design team can decide with that information in hand.规范周期的影响很重要。在某一周期下获批的项目,将按该周期的要求接受评判,而早期做出的设计决策可能把您锁定在一条路径上——若在后续周期下,这条路径的成本本可以更低。我们会指出待生效的周期变更将如何影响合规策略,让设计团队在掌握信息的前提下做决定。

WHEN IT APPLIES适用情形

Which projects need a report哪些项目需要报告

The trigger is a permit combined with work the standard regulates. Cosmetic work generally does not qualify.触发条件是许可证与该标准所监管的工程相结合。纯装饰性工程通常不适用。

Not sure which category your project falls into? Send us the scope and we will tell you before you commit to a schedule.不确定您的项目属于哪一类?请将工程范围发给我们,我们会在您确定排期之前给出答复。

WHAT WE NEED所需资料

Inputs, and what each one drives输入资料及其影响

Incomplete plans are the most common cause of delay. If an item is undecided, say so — we can model an assumption and show you what changing it would cost.图纸不完整是最常见的延误原因。若某项内容尚未确定,请直接说明——我们可以按假定条件建模,并展示改变该条件的影响。

Project address项目地址Sets the CEC climate zone and the permitting authority. Climate zone determines which prescriptive measures count and which performance trade-offs are available.决定 CEC 气候区与许可主管部门。气候区决定了哪些规定性措施有效,以及可采用哪些性能权衡方案。
Architectural plans建筑图纸Floor area, ceiling heights, and the conditioned space boundary. Also the orientation that drives solar gain in the performance path.建筑面积、层高与空调使用空间边界。同时决定性能路径中影响太阳得热的朝向。
Envelope assembly details围护结构构造详图Insulation R-values, framing type and spacing, and air-sealing approach. These drive both the envelope credits and whether QII is claimed.保温 R 值、龙骨类型与间距、气密处理方式。这些既决定围护结构的合规得分,也决定是否申报 QII。
Window and skylight schedule门窗与天窗表U-factor and SHGC per opening. Glazing is frequently the least flexible part of a prescriptive path.每个洞口的 U 值与 SHGC。在规定性路径中,玻璃配置往往是最缺乏弹性的一环。
HVAC specifications and duct layout暖通设备规格与风管布置Equipment efficiency, system type, duct location relative to the conditioned boundary, and design airflow. Sets which diagnostic tests the CF-3R will require.设备效率、系统类型、风管相对于空调边界的位置,以及设计风量。决定 CF-3R 将要求哪些诊断测试。
Water heater and lighting热水器与照明Water heater type and efficiency — heat-pump units carry significant credit in most zones. Lighting plan where the jurisdiction applies those provisions.热水器类型与能效——热泵热水器在多数气候区可带来可观的合规得分。以及在主管辖区执行相关条款时的照明方案。

HOW IT RUNS服务流程

From plans to permit submittal从图纸到许可提交

  1. Send plans, address and scope提供图纸、地址与工程范围
  2. We review and confirm the compliance path我们审核并确认合规路径
  3. Energy model and CF-1R drafted建立能耗模型并编制 CF-1R 草案
  4. Design team review, revisions if needed设计团队审核,必要时修订
  5. Final report issued for permit submittal出具最终报告用于许可提交

If the design does not comply, the report will not pass and submitting it would only waste a plan-check cycle. Instead we show you where the gap is and what closes it — usually a specific envelope upgrade, an efficiency improvement to a piece of equipment, or a move from the prescriptive to the performance path — with the relative costs so your team can choose deliberately.如果设计不合规,报告将无法通过,提交它只会浪费一轮图纸审查周期。我们会指出差距所在以及如何弥补——通常是某项具体的围护结构升级、某台设备的能效提升,或从规定性路径改为性能路径——并附上各自的相对成本,让您的团队有依据地做出选择。

When project details change after the report is issued, we update it. Design changes are normal, and a report that no longer matches what was built is worse than no report at all — it is the reason permits fail at final inspection.报告出具后若项目细节发生变化,我们会进行更新。设计变更是常态,而一份与实际施工内容不再匹配的报告比没有报告更糟——那正是许可证在最终验收时被驳回的原因。

GOOD QUESTIONS常见问题

Title 24 reporting questionsTitle 24 报告常见问题

Four we get most often on compliance reporting. The full set is on the FAQ page.以下是合规报告中最常见的四个问题。完整列表请见常见问题页面。

Does my project need a Title 24 report?我的项目需要 Title 24 报告吗?

New residential construction does. Beyond that, the trigger is a permit combined with work the Building Energy Efficiency Standards regulate: additions that extend conditioned space, ADUs and JADUs, alterations to the envelope, replacement of HVAC equipment, ductwork changes, water heater replacement, reroofs over conditioned space, and window or skylight replacement. Cosmetic work generally does not trigger a report. The deciding factor is what the local building department classifies the work as, so if you are on the edge, send us the scope and we will tell you before you spend anything.新建住宅工程需要。除此之外,触发条件是许可证与该能效标准所监管的工程相结合:扩大空调空间的扩建、ADU 与 JADU、围护结构改造、暖通设备更换、风管改动、热水器更换、空调空间上方的屋面重铺,以及窗户或天窗更换。纯装饰性工程通常不触发报告要求。决定性因素是当地建筑主管部门对该工程的分类,因此如果情况处于边界,请将工程范围发给我们,我们会在您产生任何费用之前给出答复。

What is the difference between the CF-1R and the CF-3R?CF-1R 与 CF-3R 有什么区别?

The CF-1R is the Certificate of Compliance. It comes out of the energy model and is submitted with the permit application — it states which measures the project is claiming and how it meets the standard. The CF-3R is the Certificate of Field Verification and Diagnostic Testing. It comes at the end, from the rater, and records the measured results proving those claimed measures were installed. The CF-1R sets the scope; the CF-3R closes the permit. One is a design document, the other is a field record.CF-1R 是合规证书。它由能耗模型产出,随许可申请一并提交——说明项目申报了哪些措施以及如何满足标准。CF-3R 是现场核验与诊断测试证书。它在流程末端由评级师出具,记录实测结果以证明所申报的措施已经安装。CF-1R 确定范围;CF-3R 用于关闭许可证。前者是设计文件,后者是现场记录。

What does the consultant need from me to produce the report?编制报告需要我提供哪些资料?

Architectural plans showing floor area, ceiling heights and the conditioned space boundary; the envelope assembly details with insulation R-values and framing; window and skylight schedules with U-factor and SHGC; HVAC equipment specifications and the duct layout; water heater specification; lighting plan; and the project address so we can set the correct CEC climate zone. If any of it is undecided, tell us — we can model assumptions and flag which choices will move the result, so your design team can decide with the trade-offs visible rather than guessing.需要提供标明建筑面积、层高与空调空间边界的建筑图纸;含保温 R 值与龙骨信息的围护结构构造详图;含 U 值与 SHGC 的门窗及天窗表;暖通设备规格与风管布置图;热水器规格;照明方案;以及项目地址,以便我们设定正确的 CEC 气候区。如有任何内容尚未确定,请告知我们——我们可以按假定条件建模,并指出哪些选择会影响结果,让您的设计团队在权衡清晰的前提下决策,而不是靠猜测。

What happens if the design does not comply?如果设计不合规会怎样?

The report will not pass, and submitting it would just waste a plan-check cycle. Instead we show you where the gap is and what closes it — usually a specific envelope upgrade, an efficiency improvement to a piece of equipment, or a change to the compliance path from prescriptive to performance. We come back with the options and their relative costs so the design team can choose deliberately. Re-modeling after a design change is normal and expected; what we avoid is issuing a report that the jurisdiction will reject.报告将无法通过,提交它只会浪费一轮图纸审查周期。我们会指出差距所在以及如何弥补——通常是某项具体的围护结构升级、某台设备的能效提升,或将合规路径由规定性改为性能路径。我们会带着各项方案及其相对成本回复,让设计团队有依据地做出选择。设计变更后重新建模是正常且预期之内的;我们要避免的是出具一份会被主管部门驳回的报告。

All 64 questions ↗查看全部 64 个问题 ↗

RELATED相关内容

The rest of the compliance chain合规流程的其他环节

Title 24 reporting is the design half. The field half and the local detail are covered separately.Title 24 报告是合规流程的设计环节。现场环节与本地细节另有专页说明。

NEXT STEP下一步

Send us the plans请将图纸发给我们

Project address, scope of work, and whatever drawings you have. We will confirm the compliance path, the climate zone requirements, and what the report will cost before you commit.请提供项目地址、工程范围以及您现有的图纸。我们会先确认合规路径、气候区要求与报告费用,再由您决定是否推进。

Request a Title 24 report申请 Title 24 报告