An ECC rating is not a design document and it is not an opinion about the building. It is the field record that says the energy measures called for in the approved compliance documents were actually installed, and that they were tested where testing is required. The building department keeps it on file. Without it, the permit stays open.ECC 评级不是设计文件,也不是对建筑的主观评价。它是一份现场记录,用以说明已获批合规文件所要求的节能措施确实已经安装,且在要求测试的地方已经完成测试。建筑主管部门将其存档。缺少这份记录,许可证就无法结案。
Scope is driven by the project's own CF-1R. That document lists which measures were claimed on the compliance path — insulation quality, envelope air leakage, duct leakage, fan efficacy, refrigerant charge — and each listed measure becomes something the rater has to verify in the field. Two houses of identical size can need completely different test sets depending on what their reports claimed.服务范围由项目自身的 CF-1R 决定。该文件列出了合规路径中所申报的措施——保温质量、围护结构气密性、风管泄漏、风机效能、制冷剂充注——每一项申报措施都成为评级师必须在现场核验的内容。两栋面积相同的住宅,因报告申报内容不同,所需的测试项目可能完全不同。
We record what we measure. If a duct system leaks more than the allowance, or insulation placement does not meet QII criteria, or a fan is moving less air than specified, that goes on the form with the measured value. Findings come with what has to change, and in most cases the correction is targeted enough that we only return to re-verify that one measure.我们如实记录实测结果。如果风管系统泄漏超过允许值、保温铺设不符合 QII 标准、或风机风量低于规定值,这些都会连同实测数值一并写入表格。我们会同时说明需要整改的内容,且多数情况下整改范围足够具体,我们只需返场复核该项措施。
Timing is where projects most often get stuck. Quality Insulation Inspection has to happen after insulation is in but before drywall or other finishes close the cavity — once the work is concealed it cannot be inspected without opening it back up. Send your construction schedule when you book and we will flag which measures need a slot before the next trade closes the work.项目最容易卡住的环节是时间安排。保温质量检查必须在保温安装完成后、石膏板或其他饰面封闭腔体之前进行——一旦工程被封闭,不拆开就无法检查。预约时请提供施工进度表,我们会指出哪些措施必须在下一道工序封闭之前安排。